Yamaha 2016 Grizzly yfm700gplg Service Manual page 75

Table of Contents

Advertisement

1. Headlight lead (left)
2. Four-wheel-drive motor relay 1
3. Four-wheel-drive motor relay 2
4. Headlight relay
5. Battery
6. ECU (Engine Control Unit)
7. Negative battery lead
8. Headlight lead (right)
9. Radiator fan motor lead
10. EPS (electric power steering) control unit (for EPS
models)
11. Auxiliary DC jack lead
12. Main switch lead
13. EPS control unit lead (for EPS models)
14. Radiator fan motor relay
15. Fuel injection system relay
16. Headlight relay 2
17. Final drive case breather hose
18. Differential motor lead
19. EPS motor lead (for EPS models)
20. EPS torque sensor lead (for EPS models)
21. Starter motor lead
22. Meter assembly lead
23. Wire harness
24. Lean angle sensor lead
25. Coolant reservoir breather hose
26. Fuse box
27. Main fuse
28. EPS fuse (for EPS models)
29. Starter relay
30. Positive battery lead
31. Ground lead
32. Coolant reservoir hose
33. Differential case breather hose
34. Radiator fan motor breather hose
35. Horn lead (except for CDN)
A. To headlight (left)
B. Connect the headlight coupler, and then fasten the
coupler with the holder on the electrical
components tray.
C. To headlight (right)
D. Route the negative battery lead along the guide on
the electrical components tray.
E. Place the couplers on the inside of the electrical
components tray.
F. To main switch and auxiliary DC jack
G. Route the final drive case breather hose above the
leads in the electrical components tray.
H. Route the starter motor lead above the leads in the
electrical components tray.
I.
Fasten the EPS control unit leads with the holder.
(for EPS models)
J. Fasten the meter assembly lead and EPS control
unit lead with the twist tie. (for EPS models)
K. Fasten the handlebar switch lead (left), On-
Command four-wheel-drive motor switch and
differential gear lock switch lead, front brake light
switch lead, rear brake light switch lead, and horn
switch lead (except for CDN) with the holder.
L. Pass the coolant reservoir breather hose through
the guides on the electrical components tray and
route it under the positive battery lead and starter
motor lead.
M. Route the hoses under the positive battery lead,
and then route them upward, to the inside of the
coolant reservoir breather hose and horn lead
(except for CDN).
N. Fasten the coolant reservoir breather hose with the
holder on the electrical components tray.
O. Route the hoses under the positive battery lead,
and then route them upward, to the inside of the
coolant reservoir breather hose.
P. Pass the hoses and ground lead, and horn lead
(except for CDN) through the opening in the
electrical components tray.
Q. Route the coolant reservoir breather hose above
the other hoses.
R. Route the hoses to the inside of the screw.
S. Except for EPS models
T. Fasten the meter assembly lead with the holder.
2-44
CABLE ROUTING

Advertisement

Table of Contents
loading

Table of Contents