Unpacking The Blackdiamond 8806 Chassis - Extreme Networks BlackDiamond 8800 Hardware Install Manual

Hide thumbs Also See for BlackDiamond 8800:
Table of Contents

Advertisement

Verify that the following items are included in the shipping carton:
BlackDiamond 8810 chassis with eight installed blank front panels
Power cord retainer
19-inch support bracket
BlackDiamond documentation pack with ESD-preventive wrist strap
The ESD-preventive wrist strap is required for installing modules in the chassis.
Note
Save all packaging, clip locks, and box pieces for future use in the event that the
BlackDiamond 8810 chassis must be moved to another location or returned to Extreme
Networks.

Unpacking the BlackDiamond 8806 Chassis

Caution
The BlackDiamond 8806 chassis weighs almost 65 pounds. Proper lifting and moving of the
chassis requires two people.
To unpack the BlackDiamond 8806 chassis:
1
Open the top flaps and remove the accessories from the shipping carton
Lift out the packing foam.
Figure 43: Removing Accessories from the BlackDiamond 8806 Chassis Shipping
Carton
BlackDiamond 8800 Hardware Install Guide
Installing the BlackDiamond 8800 Series Chassis
(see the following
figure).
67

Advertisement

Table of Contents
loading

Table of Contents