8.7.7

Checking the connections

Once the energy storage system has been installed and
connected, it is necessary to check whether the system signals a
current flow in all three phases (plausibility).
Return to the welcome page and click on the System tab.
Check the measured values for I Grid for plausibility.
An error has occurred if the value for I Grid hovers
between +0.01 and 0.01 at all three phases. Check the
cable connection to the current sensor.
Note: The system may need to have a large load at all three
phases.