NOTICE!
The position of the interrupt facilities is marked in the
connection diagrams (see Figures 1a/1b and 2a/2b in the
attachment).
8.3.1
Connections at the distributor
The following connections must be prepared:
Device connection: 5 x 2.5 mm²
Sensor cable: RJ12
LAN connection
46
Property damage if the electrical connections
are incorrectly installed!
During installation, respect the conductor cross-
sections specified in the instructions!
A suitable interruption facility must be installed
between power grid and customer plant (e.g.
selective automatic cut-out 'SAC'), which can be
used for all-poles disconnection of the customer
plant from the grid during maintenance work.
Do not expose the RJ12 cable to mechanical
load.
Subject to alteration!
Updated 11/2015