Suzuki GZ250 Service Manual page 44

Hide thumbs Also See for GZ250:
Table of Contents

Advertisement

• Tighten the exhaust pipe bolts and muffler mounting bolt
to the specified torque.
Exhaust pipe bolt: 14 N-m (1.4 kg-m, 10.0 Ib-ft)
Muffler mounting bolt: 29 N-m (2.9 kg-m, 21.0 Ib-ft)
CAUTION
Check the wire, cable and hose routing.
(See pp. 7-11 to -18.)
• Install the right footrest and tighten its mounting bolts to
the specified torque.
Front footrest bolt: 26 N-m (2.6 kg-m, 19.0 Ib-ft)
• After remounting the engine, the following adjustments
are necessary.
* Engine idling speed ................................ See p. 2-7.
* Throttle cable play .................................. See p. 2-8.
* Starter plunger cable play ..................... See p. 2-9.
* Clutch lever play ................................... See p. 2-9.
* Drive chain slack .................................. See p. 2-11.
* Rear brake pedal height and
free travel ............................................. See p. 2-14.
• Pour 1 700 ml (1.8/1.5 US/Imp qt) of SAE 10W/40 en
gine oil, graded SF or SG, into the engine after overhaul
ing it. Start up the engine and allow it run for several
minutes at idle speed. Stop the engine, wait a few min
utes and check the oil level. If the level is below the "L"
line, add oil until the level reaches the "F" line. (See pp.
2-9 and -10.)
ENGINE 3-8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents