Vent pipe:
Install vent pipe through the wall thimble and attach to ue outlet collar on top of the replace. Secure all joints with screws
and seal with approved "High Temp." self-adhesive aluminum tape provided.
Adjust the replace position so that the vent pipe does not protrude beyond the outer wall. The vent connector on the
termination will accommodate walls up to 12" thick.
Wall vent terminal:
1. Engage the terminal with the vent pipe and slide terminal into place. Ensure that both inner and outer pipes are fully
engaged and then attach the terminal to the outside wall. The vent terminal must not be recessed into the exterior
wall or siding.
2. Caulk in place to prevent any moisture entering the building.
NOTE: MINIMUM CLEARANCES TO THE VENT TERMINAL MUST BE MAINTAINED. See page 28.
Figure 40:
TC36D Wall vent
terminal framing.
TC36_D & TC36_DAR_101215-52
WALL SHIELD THIMBLE
TCVT.THIMA
UP TO 24"
VENT PIPE
TCVT.811X24
ELBOW
TCVT.811XLB90
MIN 24"
VENT PIPE
TCVT.811X24
23
14 1/2" FRAMED
OPENING
* MINIMUM HEIGHT FROM THE FLOOR TO CENTER OF
THE OPENING WITH A MAXIMUM HORIZONTAL RUN OF
18" FROM THE CENTER OF THE FLUE OUTLET TO THE
OUTSIDE FACE OF THE OUTER WALL. THE HEIGHT WILL
NEED TO BE INCREASED IF A LONGER HORIZONTAL PIPE
IS REQUIRED.
5056.427D
HORIZONTAL
TERMINAL
TCVT.9360
*
68 1/2"