Prepare The Fireplace; Nailing Flange Assembly And Installation; Glass Frame Assembly Removal - kozy heat windom 56101 Installation And Operation Manual

Direct vent fireplace
Table of Contents

Advertisement

NAILING FLANGE ASSEMBLY & INSTALLATION
1.
Remove (4) nailing flanges from fireplace sides.
2.
With the 1/4" (6mm) stand-offs on nailing flanges facing away from fireplace, align nailing flange with holes on outside corners of
fireplace. Secure with screws (provided in components packet) through slots in nailing flanges.
3.
Bend perforation on nailing flange until parallel with fireplace face. Do not bend toward fireplace face.
4.
Position framing stud against 1/4" (6mm) stand-off (located on backside of nailing flange). Secure with nails or screws.
NOTE
Depending on facing material, nailing flanges can be adjusted forward or backwards up to 1/2" (13mm).
CAUTION
Never permanently remove these assemblies from fireplace. They must be secured in place regardless of finish material used.
Figure 12a
FRONT VIEW
DO NOT OPERATE THIS FIREPLACE WITH GLASS REMOVED, CRACKED OR BROKEN. REPLACEMENT OF GLASS ASSEMBLY,
#700-07T SHOULD BE DONE BY A LICENSED OR QUALIFIED SERVICE PERSON.
WARNING
DO NOT REMOVE GLASS ASSEMBLY WHEN HOT!
REMOVE GLASS FRAME ASSEMBLY
Remove upper grill and open lower grill before removing glass frame assembly.
A. Locate spring-loaded handles securing glass frame assembly at bottom of firebox.
B.
Pull bottom handles out and down to release glass frame assembly bottom.
C.
Pull bottom of glass frame assembly out and lift up off tabs at top of firebox.
INSTALL GLASS FRAME ASSEMBLY
A. Place glass frame assembly top over tabs at top of firebox.
B.
Pull bottom handles out and up to secure glass frame assembly bottom.

PREPARE THE FIREPLACE

1/4" (6mm) CLEARANCE
STAND-OFF
NAILING FLANGE
FRAMING STUD
GLASS FRAME ASSEMBLY
1/4" (6mm) CLEARANCE
STAND-OFF
FRAMING STUD
NAILING FLANGE
TOP VIEW
Figure 12b
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents