Xerox Document Workcenter 150 Service Manual page 71

Table of Contents

Advertisement

1. Rotate the Paper Feed Roller and Slip Ring
Spacer to the front towards the Carriage
Assembly (Figure 2).
Spacer
Figure 2
Rotate Paper Feed Roller and
Slip Ring Spacer
2.
Rotate the ASF Cam Gear until the ASF Trays
are in the down position and the ASF Cam
Gear is as shown (Figure 3).
3.
Install the Side Frame Assembly,
a.
b.
c.
d.
e.
f.
Carefully
insert
the
Side
Frame
Assembly.
Slide the Side Frame Assembly back
out just far enough to allow alignment of
the Lift Gear to the ASF Cam Gear.
Align the marks on the gears as shown
(Figure 4).
Secure the Side Frame Assembly with
the three (3) screws.
Install the Reverse Spring oriented as
shown (Figure 5).
Reinstall the Pump. tube to the inlet pelt
(Figure 6).
4. Reinstall the remaining components in the
n?"er~e order.
Pointer on ASF
Figure
4
Align marks on gears
Adjustments
5.
Head Gap (ADJ 5.2)
6. Grid Adjust (ADJ 5.1)
Paper Feed Roller Gear
Figure 5
install Reverse Spring
Pump Tube
ASF C8m Gear
Figure 6
Install Pump Tube
Figure 3
Rotate ASF Cam Gear
5196
Document workcenter 150
4-15
REP 3.6 Side Frame Assembly

Advertisement

Table of Contents
loading

Table of Contents