section 121 Checking the transformer;
power supply cord and low-voltage cord
Disassemble the transformer as indicated in section 122.
1
81-pin low-voltage connector
3
16-pin high-voltage connector
1
3
81-pin low-voltage connector
16-pin high-voltage connector
Set the multimeter to "Measure resistance" [1].
Check the power supply cord and the low-voltage cord for
breaks. The electrical resistance measured separately for
every wire must be approx. 0
plug and the black contacts (high-voltage connector pins 3, 4,
7 and low-voltage connector pins 1, 25, 27, 28, 52, 80, 81) on
the UBA 3 mounting base [3].
Check the power supply cord and the low-voltage cord for
internal short circuiting. The electrical resistance, measured
between two random wires, must be infinite.
Measure the electrical resistance over the power supply cord
and the low-voltage cord to ground. The electrical resistance
must be infinite for every individual wire.
Install the transformer in reverse order.
86
2
2
Ω
[2]. Measure between the
Logamax plus GB162-80 kW/100 kW - Subject to modifications resulting from technical improvements!
section 122 Replace transformer
H
DANGER OF FATAL ACCIDENT
due to electric shock!
Switch off the power supply to the heating system, see
section 72.
Open the boiler door as instructed in section 73.
Remove the UBA 3 as instructed in section 82.
Remove the cover from the connection tray, see section 114.
While depressing the lock using a screwdriver [1] pull the
transformer upwards [2].
Remove both the power supply plug [3] and the low-voltage
plug [4].
Install the new transformer in reverse order.
Install the lid on the connection tray in reverse order.
Install the UBA 3 in reverse order of removal.
Close the boiler door as instructed in section 77.
Switch on the power supply to the heating system, see
section 79.