Inserting The Supply Pipe (Parts Crate); Installing Sensor Well (Fittings Crate) - Buderus Logano G615 Installation And Service Instructions Manual

Low-temperature oil/gas boiler boilers for oil/gas-fired power burners
Table of Contents

Advertisement

7
Boiler block assembly
7.4
Inserting the supply pipe (parts
crate)
For boilers with 9 – 11 sections, the supply pipe consists
of 2 pieces, and 12 – 16 sections 3 pieces.
B Push the flat gasket over the supply pipe.
B Push the supply pipe from the front into the top boiler
hub.
B Close off with flange cover.
The supply pipe must be fixed in such a way
that the holes on the supply pipe are
positioned at the correct angle. This ensures
optimum distribution of water in the area of
the top boiler hub (Thermostream principle).
B Make sure that the cam [3]) on the end
plate of the supply pipe (
in the notch in the top boiler hub
(
Fig 22, [5]).
3
4
5
2
1
Fig. 22 Sealing in the supply pipe
1
Flat gasket
2
Flange cover
3
Cam
4
Supply pipe
5
Notch in top boiler hub
24
7.5
Sensor well R ¾ "
B Seal and install sensor well R ¾ " from the front
Sensor well R ½ "
B Seal and install sensor well R ½ " from the front
Fig. 22, [3]) fits
3
5
Fig. 23 Installing sensor wells
1
2
720 42 25-19.1o

Installing sensor well (fittings crate)

(length: 4 21/64" (110 mm)) into the top R ¾ " tapped
hole of the supply connection.
(length: 4 21/64" (110 mm)) into the lower R ½ "
tapped hole of the supply connection.
Sensor well R ¾ "
Sensor well R ½ "
Logano G615 - Subject to technical modifications
1
2
720 42 25-20.1o

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents