7
Boiler block assembly
2
1
Fig. 22 Fitting the tie rods
The next step describes the installation of the supply pipe
( Chapter 7.4, page 18).
7.3
Setting up the boiler block – (assembled block)
DANGER: Risk of fatal injury from falling objects.
▶ Provide a suitable means of supporting the load.
▶ Observe all locally applicable occupational health &
safety regulations regarding lifting equipment.
▶ Cut the straps ( Fig. 23, [1]).
▶ Remove the pallet prior to positioning the boiler block
( Fig. 23, [2]).
2
Fig. 23 Boiler block on pallet
▶ Level the boiler block vertically and horizontally on the base/impact
sound-absorbing base ( Chapter 6.3, page 12). Use the boiler
section foot wedges provided for this purpose.
The following pages describe the installation of the supply pipe and
sensor well. You must do both irrespective of whether the boiler is
supplied pre-assembled or in separate sections.
18
7.4

Inserting the supply pipe (parts crate)

The supply pipe ( Fig. 24, [4]) consists of 2 pieces for boilers with
3
10 – 12 boiler sections.
▶ Push the flat gasket over the supply pipe ( Fig. 24, [1]).
▶ Push the supply pipe from the front into the top boiler hub.
▶ Close off with flange cover ( Fig. 24, [2]).
4
720 42 23-20.1o
2
1
Fig. 24 Installing the supply pipe
7.5

Installing the sensor well

▶ Seal and install the sensor well R ¾ from the rear of the boiler (length:
110 mm) into the R ¾ tapped hole of the supply connection
( Fig. 25, [1]).
1
720 42 23-21.1o
Fig. 25 Fitting the sensor well
The supply pipe must be fixed in such a way that the
holes on the supply pipe are positioned at the correct
angle. This ensures optimum distribution of water in the
area of the top boiler hub (Thermostream principle).
▶ Make sure that the cam [3] on the end plate of the
supply pipe ( Fig. 24, [3]) fits in the notch in the
top boiler hub ( Fig 24, [5]).
3
4
5
Logano G515 – 6 720 647 208 (2014/09)
720 42 23-22.1o
1
720 42 23-23.1o

Hide quick links: