Horizontal Left-Right Vent Configuration Diagram - Carrier 59TN6A Installation, Start-Up, Operating And Service And Maintenance Instructions

Carrier 59tn6a two-stage, variable speed multipoise gas furnace
Table of Contents

Advertisement

AI 1327
HORIZONTAL
LEFT -
VERTICAL
VENT CONFIGURATION
I
A11328
HORIZONTAL
LEFT -
LEFT VENT CONFIGURATION
HORIZONTAL LEFT-
RIGHT VENT CONFIGURATION*
*RequiresAccessoryInternalVent Kit
SeeProductDatafor CurrentKitNumber
Al1329
(_
Attach vent pipe adapter with gasket to furnace casing.
(_) Align notches in rubber coupling over standoffs on adapter.
Slide clamps over the coupling.
Q
Slide vent pipe through adapter and coupling into vent elbow.
(_
Insert vent pipe into vent elbow.
C)
Torque all clamps 15 lb.-in.
(_
Attach combustion air pipe adapter with gasket to furnace.
(_)
Attach combustion air pipe to adapter with silicone.
Pilot drill a 1/8-in.
hole in adapter and secure with a #7 x 1/2-in sheet metal screw.
Fig. 41 - Horizontal Left (Appearance
may vary)
A11340
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents