Combustion Air And Vent Pipe Termination For Direct Vent System; Vent Pipe Termination For Non-Direct Vent - Carrier 59TN6A Installation, Start-Up, Operating And Service And Maintenance Instructions

Carrier 59tn6a two-stage, variable speed multipoise gas furnace
Table of Contents

Advertisement

clearance
above
Con_ntric
Vent and Corn bustion Air
Roof Termination
{ptefurted)
...........
\\\\\
Fig. 47 - Combustion
Air and Vent Pipe Termination
for Direct Vent (2-Pipe)
System
A05090
Roof
Termination
(Preferred)
cr_ 305mm)
mnmum
earance
above
highest
a_licipated
snow
bevel maximum
of
24 in (610ram)
above
roof
[i::::° i
Abandoned
masonry
used
as raceway
(percode)
12 in
rain
(305 mm)fron
overhang
or roof
6 in
(152ram)
minimum
clearance
between
wal[
aid
end of vent
pipe
10 in
(254mm)
maximum
pipe
[enql]
Side walHermination
with
2 ehbows
(preferred)
12 in
(305 ram)
rain from
overhang
or roof
Maintain
12 in
(305ram)
minimum
clearance
above
highest
a_licipated
snow
level
or grade
whichever
is greater
_O5mm)
ghest
anticipated
snow
level or grade
whichever
is greater
Sidewall
Termination
with
Straight
Pipe (preferred)
Fig. 48 - Vent Pipe Termination
for Non-Direct
Vent and Ventilated
Combustion
Air System
A05091
58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents