Condensate Trap Field Drain Attachment; Pressure Switch Tubing; Condensate Trap Freeze Protection; Horizontal Left (Supply-Air Discharge) Applications - Carrier 58MTA Installation, Start-Up, And Operating Instructions Manual

Sizes 060-120, series 120 deluxe 4–way multipoise 2-stage direct vent condensing gas furnace
Table of Contents

Advertisement

(a.) Determine appropriate length and cut.
(b.) Connect tube to condensate trap.
(c.) Clamp tube to prevent any condensate leakage.
(2.) Condensate Trap Located on Right Side of Casing
(a.) Route inducer housing drain tube (violet label)
directly from inducer housing to condensate trap
as shown in Fig. 9.
(b.) Determine appropriate length and cut.
(c.) Connect tube to condensate trap.
(d.) Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
Refer to Pressure Switch Tubing section for connection
procedure.

CONDENSATE TRAP FIELD DRAIN ATTACHMENT

Refer to Condensate Drain section for recommendations and
procedures.

PRESSURE SWITCH TUBING

One collector box pressure tube (pink label) is factory connected to
the High Pressure Switch for use when furnace is installed in
upflow applications. This tube MUST be disconnected and used
for the condensate trap relief port tube. The other collector box
pressure tube (green label) which was factory connected to the
condensate trap relief port connection MUST be connected to the
High Pressure Switch in DOWNFLOW or HORIZONTAL
RIGHT applications
NOTE: See Fig. 8 or 9 or tube routing label on main furnace door
to check for proper connections.
1. Disconnect collector box pressure tube (pink label) attached to
High Pressure Switch.
2. Extend collector box pressure tube (green label) which was
previously connected to condensate trap relief port connection
by splicing to small diameter tube (factory-supplied in loose
parts bag).
3. Connect collector box pressure tube (green label) to High
Pressure Switch connection labeled COLLECTOR BOX.
4. Extend collector box pressure tube (pink label) which was
previously connected to High Pressure Switch by splicing to
remaining small diameter tube (factory-supplied in loose parts
bag).
5. Route this extended tube (pink label) to condensate trap relief
port connection.
6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.

CONDENSATE TRAP FREEZE PROTECTION

Refer to Condensate Drain Protection section for recommenda-
tions and procedures.
Step 4—Horizontal Left (Supply-Air Discharge)
Applications
In a horizontal left furnace application, the blower is located to the
right of the burner section, and conditioned air is discharged to the
left.

CONDENSATE TRAP LOCATION

The condensate trap must be removed from the factory-installed
blower shelf location and relocated in selected application location
as shown in Fig. 2 or 10.
To relocate condensate trap from the blower shelf to desired
location, perform the following:
1. Remove 3 tubes connected to condensate trap.
2. Remove trap from blower shelf by gently pushing tabs inward
and rotating trap.
3. Install casing hole filler cap (factory-supplied in loose parts
bag) into blower shelf hole where trap was removed.
FIRE, INJURY, OR DEATH HAZARD
Failure to follow this warning could result in electrical shock,
fire, personal injury or death.
Casing hole filler cap must be installed in blower shelf hole
when condensate trap is relocated.
4. Install condensate trap into left-hand side casing hole by
inserting tube connection stubs through casing hole and
rotating until tabs snap into locking position.
5. Fill unused condensate trap casing holes with plastic filler
caps (factory-supplied in loose parts bag).

CONDENSATE TRAP TUBING

NOTE: See Fig. 10 or tube routing label on main furnace door to
check for proper connections.
1. Collector Box Drain Tube
a. Install drain tube coupling (factory-supplied in loose parts
bag) into collector box drain tube (blue label) which was
previously connected to condensate trap.
b. Connect large diameter drain tube and clamp (factory-
supplied in loose parts bag) to drain tube coupling, extend-
ing collector box drain tube.
c. Route extended tube (blue label) to condensate trap and cut
to appropriate length.
d. Clamp tube to prevent any condensate leakage.
2. Inducer Housing Drain Tube
a. Remove and discard LOWER (molded) inducer housing
drain tube which was previously connected to condensate
trap.
b. Use inducer housing drain extension tube (violet label and
factory-supplied in loose parts bag) to connect LOWER
inducer housing drain connection to the condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.
3. Relief Port Tube
a. Extend collector box tube (green label) which was previ-
ously connected to the condensate trap by splicing to small
diameter tube (factory-supplied in loose parts bag).
b. Route extended collector box pressure tube to relief port
connection on the condensate trap.
c. Determine appropriate length, cut, and connect tube.
d. Clamp tube to prevent any condensate leakage.

CONDENSATE TRAP FIELD DRAIN ATTACHMENTS

Refer to Condensate Drain section for recommendations and
procedures.
PRESSURE SWITCH TUBING
The LOWER collector box pressure tube (pink label) is factory
connected to the High Pressure Switch for use when furnace is
installed in UPFLOW applications. This tube MUST be discon-
nected, extended, rerouted, and then reconnected to the pressure
switch in HORIZONTAL LEFT applications for 060 and 080
heating input furnaces.
NOTE: See Fig. 10 or tube routing label on main furnace door to
check for proper connections.
10