Working Platform For Attic Installation; Suspended Furnace Installation - Carrier 59TN6A Installation, Start-Up, Operating And Service And Maintenance Instructions

Carrier 59tn6a two-stage, variable speed multipoise gas furnace
Table of Contents

Advertisement

COMBUSTION
-AIR PIPE
(SEE VENTING
SECTION)
-X
\
\
A 12-1N. (305 mm) MIN HORIZONTAL
PIPE
\
\
SECTION
IS RECOMMENDED
WITH A
SHORT (5 TO 8 FT / 1.5 TO 2.4 M) VENT
SYSTEM TO REDUCE
EXCESSIVE
CONDENSATE
DROPLETS
FROM
EXITING THE VENT PIPE.
30 IN. (762 mm)
MANUAL
SHUTOFF
_INDOOR
GAS VALVE
/
COIL
SEDIMENT_
CONDENSATE
TRAP
TRAP
ROLLOUT
PROTECTION
REQUIRED
Install
12"x 22" (305 x 559 mm) sheet
metal
in front of burner
compartment
a rea.
NOTE: FURNACE
SHOWN AS DIRECT
VENT APPLICATION,
REFER TO THE
VENTING
SECTION
FOR ALLOWABLE
VENT CONFIGURATIONS
Al1154
Fig. 27 - Working
Platform
for Attic Installation
NOTE:
Local
codes may require
a drain pan and condensate
trap when a condensing
furnace
is installed
over a finished
ceiling.
COMBUSTION-AIRPIPE
_(SEEVENTING SECTION)
_1/4-IN
ROD
,/
NOTE: EXTEND ANf
IRON OUT FOR
COIL SUPPORT/
HEX NUT
/
& WASHER (4)
REQD. PER ROD
ROD LOCATION
/
USING DIMPLE
/
LOCATORS
NOTES: 1. A 1 In. (25mm) clearance minimum between
top of furnace and combustible
material
2. The entire length of furnace must be
supported when furnace is used in horizontal
position to ensure proper drainage,
3. Furnace shown is a direct vent application.
Refer to the Venting section for allowable vent
configurations.
Al1155
Fig. 28 - Suspended
Furnace
Installation
NOTE:
Local
codes may require
a drain pan and condensate
trap when a condensing
furnace
is installed
over a finished
ceiling.
2d

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents