Condensate Trap; Upflow Trap Configuration Diagram - Carrier 59TN6A Installation, Start-Up, Operating And Service And Maintenance Instructions

Carrier 59tn6a two-stage, variable speed multipoise gas furnace
Table of Contents

Advertisement

ii
CONDENSATE
TRAP
Condensate
Trap - Upflow
Orientation
When
the furnace
is installed
in the upflow
position,
it is not
necessary
to relocate
the condensate
trap or associated
tubing.
Refer
to Fig. 8 for upflow
condensate
trap information.
Refer to
Condensate
Drain
section
for
information
how
to
install
the
condensate
drain,
Condensate
Trap - Downflow
Orientation.
When
the furnace
is installed
in
the downflow
position,
the
factory-installed
trap will be located
at the upper left corner of the
collector
box.
When
the
furnace
is installed
in the
downflow
orientation,
the factory-installed
trap must be relocated
for proper
condensate
drainage,
To Relocate
the Condensate
Trap:
• Orient the fllmace in the downflow
position.
• Fig. 9 shows the condensate
trap and tubing before and after
relocation,
Refer to Fig. 9 to begin the trap conversion,
• Refer to Condensate
Drain section for infomaation
how to install the
condensate
drain,
Condensate
Trap - Horizontal
Orientation.
When
the fl_mace
is installed
in the horizontal
right
position,
the
factory-installed
trap will be located at the bottom of the collector box.
When
the
fl_mace
is installed
in the
horizontal
left position,
the
factory-installed
trap will be located
at the top of the collector
box.
The
trap must
be repositioned
on the
collector
box
for proper
condensate
drainage.
When the furnace is installed as a direct-vent
furnace, a field supplied,
accessory
Horizontal
Installation
Kit
(trap
grommet)
is required
for
all direct-vent
horizontal
installations
(only). The kit contains
a rubber
casing grommet
designed
to seal between
the furnace casing and the
condensate
trap. (See Fig. 16.)
NOTE:
The Horizontal
Installation
Kit (trap grommet)
is NOT
required
for
single-pipe,
ventilated
combustion
air,
or
other
non-direct
vent applications.
NOTE:
The condensate
trap extends
below
the side of the casing
in the
horizontal
position.
A minimum
of 2 in. (51
mm)
of
clearance
is required
between
the casing
side
and
the
furnace
platform
for the trap to extend
out of the casing
in the horizontal
position.
Allow
at least 1/4-in.
(6 mm) per foot of slope away from
the furnace in horizontal
sections
of drain line.
To Relocate
the Condensate
Trap:
• Remove the knockout
in the casing for the condensate
trap.
• Install the grommet
in the casing when required.
• Orient the fl_mace in the desired position.
• Allow for 2 in. (51 mm) of clearance underneath
the fllmace for the
condensate
trap and drain line.
• Fig. 10 shows the condensate
trap and tubing before and after
relocation in the horizontal
right position.
• Fig. 11 shows the condensate
trap and tubing before and after
relocation in the horizontal
left position.
• Refer to the appropriate
figure to begin the trap conversion,
• Refer to Condensate
Drain section for infom_ation how to install the
condensate
drain,
Condensate Trap
Relief Port
Vent Pipe Clamp
Clamp
Collector Box
Plugs
Vent Elbow
Collector Box
Plug
Condensate Trap
Relief Port
Pressure Switch
Port
UPFLOW TRAP CONFIGURATION
1 & 2 Stage Units
Fig. 8 - Upllow Trap Configuration
(Appearance
may vary)
Outlet
Trap
Al1307
12