Interlogix GE-DS-242-PoE User Manual page 20

Managed ethernet switch
Table of Contents

Advertisement

Chapter 2: Installation
Step 3: Ensure there is enough ventilation space between the Managed Switch
and surrounding objects.
Figure 2-4: Typical placement of GE-DS-242-PoE on desktop
Connection to the Managed Switch requires UTP Category 5 network
NOTE:
cabling with RJ-45 tips. Refer to the Cabling Specification in Appendix A for
further information.
Step 4: Connect the Managed Switch to network devices.
A. Connect one end of a standard network cable to the 10/100/1000 RJ-45
ports on the front of the Managed Switch.
B. Connect the other end of the cable to the network devices (printer servers,
workstations, routers etc).
Step 5: Connect the Managed Switch to supply power.
A. Connect socket end of the power cable to the socket on the Managed
Switch rear panel.
B. Connect the power cable plug to a standard wall outlet.
C. Switch the power switch on the rear panel to ON.
When the Managed Switch receives power, the Power LED should light and
remain solid Green.
Rack-mount Installation
Use the following instructions to install the Managed Switch in a 19-inch standard
rack.
16
GE-DS-242-PoE Managed Ethernet Switch User Manual

Advertisement

Table of Contents
loading

Table of Contents