Unpacking And Installing The Machine; Points To Note Before Starting The Work - Canon iR1600 Service Manual

Hide thumbs Also See for iR1600:
Table of Contents

Advertisement

2 Unpacking and Installing the Machine

2.1 Points to Note Before Starting the Work

Be sure to keep the following in mind for the work:
1. If machine is moved from a cold to warm place, condensation can de-
velop in its pickup/feeding assembly. If such a possibility exits, leave the
machine alone for 1 hr or longer, and start the work after it has become
used to the temperature of the room.
(The term condensation is used to refer to the development of droplets of
water on the surface of a metal piece, occurring when it is brought from a
cold to warm place because of the rapid cooling of the water vapor
around the metal.)
2. Be sure to work as a group of two.
COPYRIGHT© 2002 CANON INC.
2000
CANON iR1600/iR2000 REV.1 JAN. 2002
CHAPTER 11 INSTALLATION
11-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir2000

Table of Contents