Sub-Assembly I: Pulley Base-Carriage Transmission Assembly; Sub-Assembly J: Carriage-Head Assembly - Epson TM-U950 Technical Manual

Hide thumbs Also See for TM-U950:
Table of Contents

Advertisement

CONFIDENTIAL

Sub-assembly I: Pulley Base-Carriage Transmission Assembly

1.* Mount the pully-carriage transmission to the pulley base-carriage transmission sub-

Sub-assembly J: Carriage-Head Assembly

1.* Mount the oil rings on the carriage-head sub-assembly
2. Align the ribbed section of the carriage transmission belt with the ribbed section on the
3. Insert the spring-carriage hold into slot
Rev. A
assembly and fasten it with the RE.
Checkpoint
Make sure to mount the pulley-carriage transmission with the correct orientation.
carriage-head and mount the belt.
tweezers by inserting the tip into hole
that it is fixed.
Checkpoint
Make sure to mount the belt with correct orientation.
Pulley base-carriage transmission sub-assembly
of the carriage-head, depress tab
a
, and then push the spring to insert it to the end so
b
Carriage-head sub-assembly
Disassembly, Assembly, and Adjustments 5-17
TM-U950/U950P Technical Manual
with
c

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tm-u950p

Table of Contents