Epson TM-U950 Technical Manual page 172

Hide thumbs Also See for TM-U950:
Table of Contents

Advertisement

CONFIDENTIAL
Sub-assembly L-(2)
26. Engage the FPC on the cable clasp. Mount the guide-nose onto the print head unit, and then
27. Plug the FPC into the board-head relay assembly.
28. Assemble all cables at section
29. Mount the paper guide-slip-upper B on the frame-carriage assembly so that the three dowels
5-34 Disassembly, Assembly, and Adjustments
attach them and tighten the screw.
Checkpoints
Verify that the FPC is not deformed.
Verify that the print head unit is in contact with the ground plate.
match the respective dowel holes, and the hook is engaged in the catch. Then tighten the
screw.
Carriage-head assembly
.
j
Frame-carriage assembly
Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tm-u950p

Table of Contents