Installation of Boiler Components
•
Hang and close burner door and tighten evenly
with the (4) M12x45 burner door bolts (Fig. 23).
•
Cut and drill the burner mounting plate according
to burner specifications. (The burner
cut by Buderus Hydronic Systems per specifications
submitted with the boiler order).
•
Mount burner mounting plate to burner door. Seal
with 1/2" diameter sealing rope.
•
Cut burner door insulation material to conform to
burner tube diameter.
•
Mount burner per burner manufacturers instructions.
Fill burner door with insulation per instructions below.
•
Cover burner tube and sight glass port with
paper to prevent filling these areas.
•
Mix insulating cement with water to pulp
consistency.
•
Fill any spaces between burner door insulation and
burner tube with the insulating cement (Fig. 24).
plate can be
M 12 x 45
Fig. 23
Fig. 24
M 12 x 45
Burner mounting plate
5"
2
"
3/4
Sight glass
Insulating cement
Burner mounting plate
1/2" dia. sealing rope
8
15