Installation Of Boiler Components - Buderus G315 Assembly, Maintenance And Operating Instruction

Table of Contents

Advertisement

Installation of Boiler Components

Hang and close burner door and tighten evenly
with the (4) M12x45 burner door bolts (Fig. 23).
Cut and drill the burner mounting plate according
to burner specifications. (The burner
cut by Buderus Hydronic Systems per specifications
submitted with the boiler order).
Mount burner mounting plate to burner door. Seal
with 1/2" diameter sealing rope.
Cut burner door insulation material to conform to
burner tube diameter.
Mount burner per burner manufacturers instructions.
Fill burner door with insulation per instructions below.
Cover burner tube and sight glass port with
paper to prevent filling these areas.
Mix insulating cement with water to pulp
consistency.
Fill any spaces between burner door insulation and
burner tube with the insulating cement (Fig. 24).
plate can be
M 12 x 45
Fig. 23
Fig. 24
M 12 x 45
Burner mounting plate
5"
2
"
3/4
Sight glass
Insulating cement
Burner mounting plate
1/2" dia. sealing rope
8
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents