Installation
5.2

Installation Surface Requirements

The boiler is very heavy when filled with water. Make
sure the floor is strong enough to support the load.
5.3

Preparations for Boiler Installation

z Unpack all boxes and cartons and check that all parts
have been delivered using the packing list.
NOTICE !
Each boiler is checked and tested carefully
before leaving the factory. If there is any
damage or parts are missing, inform the
supplier without delay. Check all
packaging materials for missing
components before discarding them.
We reserve the right to make any changes due to technical modifications!
Installation, Operation and Maintenance Manual Sealed Combustion Gas Boiler Logano GA244 • Issue 02/2004
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
5
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents