Operating Procedure During A Path Failure Between The Primary Site Storage System And The Intermediate Site Storage System - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

6.
Execute the YKEWAIT GOTO(SUSPEND) command, and wait until the status of the Continuous
Access Journal Z copy pair has changed to SUSPOP.
7.
From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
EXCTG.
YKQUERY
YKRESYNC
YKEWAIT GOTO(DUPLEX)
Operation is returned to normal.
Operating Procedure During a Path Failure between the Primary Site Storage System
and the Intermediate Site Storage System
The following explains the procedures to be performed when a path failure occurs between the
primary site storage system and the intermediate site storage system.
424 Maintenance and Troubleshooting Operations