Failover - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

Failover

To perform a failover:
1.
Use Business Continuity Manager to detect whether a HyperSwap has been executed by TPC-R
on the primary host.
2.
Check the statuses of copy groups.
YKQUERY
3.
On the primary host, execute the YKSUSPND FLUSH command for Cnt Ac-J Z copy pairs
between the primary storage system and the remote storage system.
When an I/O error or the SUSPER status (a failure suspension) occurs, you do not need to do
anything.
YKQUERY
YKSUSPND FLUSH
YKEWAIT GOTO(SUSPEND)
Using a 2DC configuration with HyperSwap and Continuous Access Journal Z 363

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents