Establishing An Inter-Control Unit Logical Path; Acquiring Path Information From A Storage System - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

2.
Define a path set by creating a path set definition file from the ISPF panels. The procedures
for these are available in
For an inter-control unit logical path: See
in
"Using the ISPF panels" (page
For an inter-disk controller logical path: See
(page
3.
Load and establish a path set:
From the ISPF panels: see
"Using the ISPF panels" (page
Using CLI commands:
1.
Load the path set definition file by executing the YKLOAD command with the PATH
parameter specified.
2.
Establish a logical path by executing the YKBLDPTH command.
For more information, see

Establishing an Inter-Control Unit logical path

Establish an inter control-unit logical path for the following control units:
The control unit containing the copy group
The control unit containing the command device
NOTE:
You can define a logical path in one direction even if there is no disk configuration
definition file at the destination site (although there must be one at the source site).
You can establish inter-disk controller logical paths when the storage systems contain Non Gen'ed
volumes or inter-control unit logical paths. However, when establishing, deleting or acquiring the
status of an inter-control unit logical path, if all volumes in the relevant control unit are Non Gen'ed
volumes, you need to set up a route list and register a command device beforehand.
For details about creating an inter-control unit logical path that is dedicated to the command device,
see
"Creating an Inter-Control Unit Logical Path dedicated to the command device" (page

Acquiring path information from a storage system

You can acquire the logical path information registered in a storage system in the following
situations:
When you want to acquire the logical path information currently defined in the storage system
When you want to control, or acquire information for, logical paths other than those for the
defined ports
When you need to know the port number to create a path set definition even though a path
has been established
To acquire path information from a storage system, do the following:
1.
Load the path set definition file by executing the YKLOAD command with the PATH parameter
specified.
2.
Acquire the logical path information defined in the storage system by executing the YKQRYPTH
command with the RESTRUCT parameter specified.
"Creating a path set" (page
439).
"Establishing a logical path in the reverse direction" (page 115)
430).
"The Logical Path Control Function" (page
439):
"Defining the inter-CU logical path set" (page 447)
430).
"Defining the inter-DKC logical path set"
95).
122).
Creating a logical path
in
1 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents