Operating Procedure During A Primary Site Storage System Failure (Nonvolatile) - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

13. From the primary site, execute the YKRESYNC DELTAJNL command for the delta resync pair.
YKQUERY
YKRESYNC DELTAJNL
YKEWAIT GOTO(DUPLEX)
If the command is successful, the Continuous Access Journal Z copy pair on the local site and
the remote site is automatically moved to the HOLD status (delta resync pair).
Operation is returned to normal.
NOTE:
If during operation the status of a delta resync pair changes to HOLDTRNS, NODELTA,
or HOLDER, see
Operated Successfully" (page

Operating Procedure During a Primary Site Storage System Failure (Nonvolatile)

This subsection explains the procedures to be performed when the primary site storage system is
in a nonvolatile failure state.
"Actions to be Taken When the Delta Resync Function Cannot be Set Up or
340).
Using a Delta Resync Configuration 321

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents