Failback - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

YKQUERY
YKRESYNC DELTAJNL
YKEWAIT GOTO(DUPLEX)
After the commands finish successfully, the Cnt Ac-J Z copy pairs between the primary storage
system and the remote storage system are automatically moved to the HOLD status.
5.
Start primary storage system maintenance.
Operation in a 2DC configuration is performed on the local storage system.

Failback

To perform a failback:
1.
Finish the primary storage system maintenance.
2.
Use TPC-R on the primary host to restart the copying of the Cnt Ac-S copy pairs with the
HyperSwap attribute.
Cnt Ac-S copy pairs with the HyperSwap attribute are moved from the SWAPPING status to
the DUPLEX status.
Using a 2DC configuration with HyperSwap and Continuous Access Journal Z 353

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents