Operating Procedure During An Intermediate Site Storage System Failure (Volatile) - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

7.
Execute the YKEWAIT GOTO(SUSPEND) command, and wait until the status of the Continuous
Access Journal Z copy pair has changed to SUSPOP.
8.
From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
EXCTG.
YKQUERY
YKRESYNC
YKEWAIT GOTO(DUPLEX)
Operation is returned to normal.

Operating Procedure During an Intermediate Site Storage System Failure (Volatile)

The following explains the procedures to be performed when the intermediate site storage system
is in a volatile failure state.
Using a 4x4x4 Cascade Configuration 409

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents