Operating Procedure During A Remote Site Storage System Failure (Nonvolatile); Preparing; Recovering; Primary Site Host Failure - HP XP P9500 Software User's Manual

Hp p9000 business continuity manager user guide
Hide thumbs Also See for XP P9500:
Table of Contents

Advertisement

8.
Use Remote Web Console to reconfigure the delta resync control paths required between the
Primary > Local, Primary > Remote, and Local > Remote sites.
Operation is returned to normal.

Operating Procedure During a Remote Site Storage System Failure (Nonvolatile)

This subsection explains the procedure to perform when a remote site storage system is in a
nonvolatile failure state.

Preparing

No action is required.

Recovering

The recovery procedure to be performed when the remote site storage system is in a nonvolatile
state is the same as the recovery procedure performed during maintenance of the remote site
storage system. See
Maintenance" (page

Primary Site Host Failure

This subsection explains the procedure to perform when the host at the primary site fails.

Failover

To perform failover:
"Recovering" (page 309)
307).
in
"Performing Remote Site Storage System
Using a Delta Resync Configuration 333

Advertisement

Table of Contents
loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1

Table of Contents