AC distribution box
Note: Before beginning, read "Safety information" on page 109, "Before you begin"
To remove the AC distribution box:
1. Turn off server and disconnect all external cables and power cords.
2. Remove the cover. See "Removing the cover and bezel" on page 42.
3. Remove screw 1 .
4. Pull the AC distribution box 1 toward front of machine in order to release it
5. Remove the two hot-swap power supplies.
6. Pull down on the cable receptacle 5 to release it from the chassis.
System board
on page 40 and "Handling static-sensitive devices" on page 41.
from the chassis clips 3 .
Note: To install the receptacle, push up into the chassis opening of slot 4 . Be
sure to properly replace receptacles, 1 to 1 and 2 to 2, as labeled.
FRU information (service only)
81