7 Press Enter to continue.
The upgrade program stops ZENworks services, subscribes to the upgrade channels, upgrades
RPMs, upgrades zmd, runs upgrade scripts, and then upgrades the database schema.
8 (Conditional) If you have ZENworks Secondary Servers to upgrade, continue with
an In-Place Upgrade on a ZENworks Secondary Server" on page
9 Continue with
11.1.2 Performing an In-Place Upgrade on a ZENworks
Secondary Server
You must upgrade the ZENworks Primary Server before upgrading ZENworks Secondary Servers.
For step-by-step information, see
Server" on page
1 Start all ZENworks Services on the Secondary Server by running the
command.
2 Make sure the server meets the requirements. See
Requirements," on page
3 At the Linux server, mount the Novell ZENworks 7.3 Linux Management Server media by using
the
mount device mountpoint
For example,
If you are using an ISO image rather than a physical media, copy the ISO to a temporary folder
on the Linux server, then mount the image using the following command:
mount -o loop /tempfolderpath/isoimagename.iso mountpoint
Replace tempfolderpath with the path to the temporary folder and replace mountpoint with the
path to the file system location where you want to mount the image. The path specified by
mountpoint must already exist.
For example:
mount -o loop /zlm73/ZEN73_LinuxMgmt.iso /zlm73/install
4 Log in as
command:
./zlm-upgrade
5 When prompted to upgrade ZENworks Linux Management, enter
6 Review the Software License Agreement, pressing Page Down to scroll down the page, then
enter
The install program stops ZENworks services, subscribes to the upgrade channels, upgrades
RPMs, upgrades zmd, runs upgrade scripts, and then restarts the ZENworks services.
7 Enter
8 Enter
The upgrade program stops ZENworks services, subscribes to the upgrade channels, upgrades
RPMs, upgrades zmd, and runs upgrade scripts.
After the upgrade is complete, the ZENworks services are restarted. This might take a few
minutes.
84
Novell ZENworks 7.3 Linux Management Installation Guide
Section 11.5.2, "Upgrading the Managed Devices," on page
"Performing an In-Place Upgrade on the ZENworks Primary
83.
23.
mount /dev/cdrom /zlm73
, then start the upgrade program from the mount point by running the following
root
to accept the agreement.
Y
when you are asked if you are upgrading a ZENworks Primary Server.
N
when you are asked if you have upgraded the ZENworks Primary Server.
Y
Section 2.1, "ZENworks Server
command.
.
"Performing
84.
94.
zlm-config --start
to continue.
Y