Novell ZENWORKS LINUX MANAGEMENT 7.3 IR2 - INSTALLATION GUIDE 07-20-2009 Installation Manual page 106

Hide thumbs Also See for ZENWORKS LINUX MANAGEMENT 7.3 IR2 - INSTALLATION GUIDE 07-20-2009:
Table of Contents

Advertisement

NOTE: In the
upgrade are commented out by default. If you want the messages to be displayed on the
managed device, uncomment the messages.
The Post Installation script performs the following tasks:
Restores the bundle locks and package locks backup from the
appropriate directories.
Creates the
service, removes the system catalogs, and restarts the service.
Uses the atd server to assign a scheduled task and execute the
script two minutes after the
14 Click OK.
15 Click Apply at the bottom of the Details page.
16 In the RPM Package Bundle Settings section of the Details page, click Deploy to deploy the
new version of the bundle.
17 Continue with
Creating Catalogs for Upgrade Bundles
1 In the ZENworks Control Center, click the Bundles tab.
2 Click New, then click Catalog to open the Create New Catalog Wizard.
3 Specify a name for the catalog, then click Next to display the Catalog Attributes page.
4 Click Next to display the Summary page.
5 On the Summary page, click Next.
6 Click Add to display the Select Bundles dialog box.
7 Navigate to and click the desired upgrade bundle to move it to the Selected list, then click OK.
8 Click Next to display the Catalog Assignments page.
9 Click Add, navigate to and click the desired devices to move them to the Selected list, then click
OK to display the Bundles Options page.
10 Click Next to display the Finish page, review the information, then click Finish.
11 Depending on your needs, continue with
and SLED 10 by Using an Upgrade Bundle" on page 106
Managed Devices by Using an Upgrade Bundle" on page
Upgrading Managed Devices Other Than SLES 10 and SLED 10 by Using an Upgrade
Bundle
1 In the ZENworks Control Center, click the Policies tab.
2 Click New, then click Policy to display the Policy Type page.
3 Select Remote Execute Policy, then click Next to display the Policy Name page.
4 Specify a name for the policy, then click Next to display the Remote Execute Policy page.
5 From the Script to run drop-down list, choose Define your own script.
6 Paste the contents of the
script file from the mount point
106 Novell ZENworks 7.3 Linux Management Installation Guide
script file, the messages indicating the progress of the
post-install.sh
/tmp/zmd/upgrade_final.sh
post-install.sh
"Creating Catalogs for Upgrade Bundles" on page
script file into the Script content box. You can access the
policy.sh
directory.
/data
shell script that automatically stops the zmd
has completed execution.
106.
"Upgrading Managed Devices Other Than SLES 10
or
"Upgrading SLES 10 or SLED 10
107.
directory to the
/tmp/zmd
shell
upgrade_final.sh

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenworks linux management 7.3 ir2

Table of Contents