Novell ZENWORKS LINUX MANAGEMENT 7.3 IR2 - INSTALLATION GUIDE 07-20-2009 Installation Manual page 102

Hide thumbs Also See for ZENWORKS LINUX MANAGEMENT 7.3 IR2 - INSTALLATION GUIDE 07-20-2009:
Table of Contents

Advertisement

Perform the following procedures in the order listed to upgrade the ZENworks Servers:
1.
Performing an In-Place Upgrade on the ZENworks Primary Server
2.
Performing an In-Place Upgrade on a ZENworks Secondary Server
Performing an In-Place Upgrade on the ZENworks Primary Server
1 Make sure that the server is running, and meets the requirements. See
Server Requirements," on page
2 At the Linux server, mount the Novell ZENworks 7.3 Linux Management with Interim Release
1 media by using the
For example,
If you are using an ISO image rather than a physical media, copy the ISO to a temporary folder
on the Linux server, then mount the image using the following command:
mount -o loop /tempfolderpath/isomimagename.iso mountpoint
Replace
the path to the file system location where you want to mount the image. The path specified by
mountpoint
For example:
mount -o loop /zlm73/ZEN73_LinuxMgmt.iso /zlm73/install
3 Log in as
command:
./zlm-upgrade
4 When prompted to upgrade ZENworks Linux Management, enter
5 Review the Software License Agreement, pressing Page Down to scroll down the page, then
enter
6 Enter
Make sure all ZENworks services on Secondary Servers are stopped. You can execute
novell/zenworks/bin/zlm-config --stop
Servers.
7 Press Enter to continue.
The upgrade program stops ZENworks services, subscribes to the upgrade channels, upgrades
RPMs, upgrades zmd, runs upgrade scripts, and then upgrades the database schema.
8 (Conditional) If you have ZENworks Secondary Servers to upgrade, continue with
an In-Place Upgrade on a ZENworks Secondary Server" on page
9 Continue with
Performing an In-Place Upgrade on a ZENworks Secondary Server
You must upgrade the ZENworks Primary Server before upgrading the ZENworks Secondary
Servers. For step-by-step information, see
Primary Server" on page
1 Start all ZENworks Services on the Secondary Server by running the
command.
102 Novell ZENworks 7.3 Linux Management Installation Guide
mount device mountpoint
mount /dev/cdrom /zlm73
with the path to the temporary folder and replace
tempfolderpath
must already exist.
, then start the upgrade program from the mount point by running the following
root
to accept the agreement.
Y
when you are asked if you are upgrading a ZENworks Primary Server.
Y
"Upgrading Managed Devices Manually" on page
102.
23.
command.
.
to shut down the services on Secondary
"Performing an In-Place Upgrade on the ZENworks
Section 2.1, "ZENworks
with
mountpoint
to continue.
Y
/opt/
"Performing
102.
104.
zlm-config --start

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenworks linux management 7.3 ir2

Table of Contents