Novell ZENWORKS LINUX MANAGEMENT 7.3 IR2 - INSTALLATION GUIDE 07-20-2009 Installation Manual page 104

Hide thumbs Also See for ZENWORKS LINUX MANAGEMENT 7.3 IR2 - INSTALLATION GUIDE 07-20-2009:
Table of Contents

Advertisement

You can upgrade the managed devices from ZENworks 7.3 Linux Management to ZENworks 7.3
Linux Management with IR1 in one of the following ways:
"Upgrading Managed Devices Manually" on page 104
"Upgrading Managed Devices by Using Upgrade Bundles" on page 104
"Upgrading Managed Devices by Using the Hot Patch 2 Channel" on page 108
Upgrading Managed Devices Manually
1 Make sure the managed device meets the requirements. See
Requirements," on page
2 At the Linux managed device, mount the Novell ZENworks 7.3 Linux Management with
Interim Release 1 Agent media by using the
For example,
If you are using an ISO image rather than a physical media, copy the ISO to a temporary folder
on the Linux managed device, then mount the image using the following command:
mount -o loop /tempfolderpath/isoimagename.iso mountpoint
Replace tempfolderpath with the path to the temporary folder and replace mountpoint with the
path to the file system location you want to mount the image. The path specified by mountpoint
must already exist.
For example:
mount -o loop /zlm73/ZEN73_LinuxMgmt.iso /zlm73/install
3 Log in as
command:
./zlm-upgrade
4 When prompted to upgrade ZENworks Linux Management, enter
5 Review the Software License Agreement, pressing Page Down to scroll down the page, then
enter
The install program stops ZENworks services, subscribes to the upgrade channels, upgrades
RPMs, upgrades zmd, runs upgrade scripts, and then restarts the ZENworks services.
Upgrading Managed Devices by Using Upgrade Bundles
Upgrading managed devices to ZENworks 7.3 Linux Management with IR1 installs the new
ZENworks Agent.
Make sure the managed device meets the requirements. See
Requirements," on page
Complete the following tasks in the order listed:
1.
"Creating an Upgrade Bundle" on page 105
2.
"Creating a Script for Upgrade Bundles" on page 105
3.
"Creating Catalogs for Upgrade Bundles" on page 106
104 Novell ZENworks 7.3 Linux Management Installation Guide
25.
mount /dev/cdrom /zlm73
, then start the upgrade program from the mount point by running the following
root
to accept the agreement.
Y
25.
Section 2.3, "Managed Device
mount device mountpoint
.
to continue.
Y
Section 2.3, "Managed Device
command.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenworks linux management 7.3 ir2

Table of Contents