2 Make sure the server meets the requirements. See
Requirements," on page
3 At the Linux server, mount the Novell ZENworks 7.3 Linux Management with Interim Release
1 Server media by using the
For example,
mount /dev/cdrom /zlm73
If you are using an ISO image rather than a physical media, copy the ISO to a temporary folder
on the Linux server, then mount the image using the following command:
mount -o loop /tempfolderpath/isoimagename.iso mountpoint
Replace tempfolderpath with the path to the temporary folder and replace mountpoint with the
path to the file system location where you want to mount the image. The path specified by
mountpoint must already exist.
For example:
mount -o loop /zlm73/ZEN73_LinuxMgmt.iso /zlm73/install
4 Log in as
, then start the upgrade program from the mount point by running the following
root
command:
./zlm-upgrade
5 When prompted to upgrade ZENworks Linux Management, enter
6 Review the Software License Agreement, pressing Page Down to scroll down the page, then
enter
to accept the agreement.
Y
The install program stops ZENworks services, subscribes to the upgrade channels, upgrades
RPMs, upgrades zmd, runs upgrade scripts, and then restarts the ZENworks services.
7 Enter
when you are asked if you are upgrading a ZENworks Primary Server.
N
8 Enter
when you are asked if you have upgraded the ZENworks Primary Server.
Y
The upgrade program stops ZENworks services, subscribes to the upgrade channels, upgrades
RPMs, upgrades zmd, and runs upgrade scripts.
After the upgrade is complete, the ZENworks services are restarted. This might take a few
minutes.
9 (Conditional) Repeat
want to upgrade.
10 Continue with
"Upgrading Managed Devices Manually" on page
or
Continue with
"Upgrading Managed Devices by Using Upgrade Bundles" on page
Upgrading Servers by Using the Hot Patch 2 Channel
1 Apply ZENworks 7.3 Linux Management Hot Patch 2. For more information on how to obtain
and apply the Hot Patch, see TID 7003346 at

12.1.2 Upgrading the Managed Devices

Upgrading the managed devices to ZENworks 7.3 Linux Management with IR1 installs the new
ZENworks Agent.
23.
mount device mountpoint
.
Step 1
through
Step 8
for each ZENworks Secondary Server that you
Novell Support
Upgrading to ZENworks 7.3 Linux Management with IR1 103
Section 2.1, "ZENworks Server
command.
to continue.
Y
104.
(http://www.novell.com/support).
104.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenworks linux management 7.3 ir2

Table of Contents