IBM 3745 Problem Determination Manual page 244

Communication controller
Table of Contents

Advertisement

o
o
o
o
o
Looking at the remote 3745 side:
If
~
Hex code is either FF4 or 000
Do
• If the control program is to be loaded from the host:
-
Check the IPL port configuration on the 3745. Refer to the 3745 Advanced Operations
Guide.
.
• If the configuration is correct, perform one of the following:
Modem
s~lf-test
on both ends and end-to-end modem test for L1C1 to L1C4 and L1C5 or
L1C6
Refer to page 9-30 for L1C1 to L1C4.
Refer to page 9-31 or 9-36 for L1C5.
Refer to page 9-44 for L1C6.
Refer to your modem documentation.
The L1C and line problem procedure (see Chapter 9).
Stand alone link test on the link-attached 3745 (see the MOSS SAT function on the 3745
Advanced Operations Guide). The channel attached controller, loaded with the control
program, acts as a responder.
If the problem is not solved, start a link IPL port trace. Select this option on the screen
used to define the link IPLport (see the MOSS LKP function on the 3745 Advanced
Operations Guide).
~
Traced data will be analyzed by the service representative.
Chapter 8. IPL Problems (From Host or Disk)
8-9

Advertisement

Table of Contents
loading

Table of Contents