Pass/Fail Result For Edited Events - Fluke Versiv Series User Manual

Cabling certification product family
Hide thumbs Also See for Versiv Series:
Table of Contents

Advertisement

Versiv Series Cabling Certification Product Family
Users Manual

PASS/FAIL Result for Edited Events

302
Find Quality Products Online at:
When you change a loss event's type, the tester changes the loss
limit for the event and recalculates the event's results and the
overall results. The recalculations can possibly change the PASS/
FAIL results. For example (refer to Figure 115):
You test a link and see a Loss event that has a loss of 0.53 dB.
This causes a FAIL result because the limit for a loss event is
0.30 dB.
You change the event to an APC Connector. Because the
selected test limit has a loss limit of 0.75 dB for connectors,
the result for the event changes to a PASS
If the loss event was the only FAIL result on the link, the
overall result will also change from FAIL to PASS.
GlobalTestSupply
www.
.com
sales@GlobalTestSupply.com

Advertisement

Table of Contents
loading

Table of Contents