Wall Mount Remote Thermostat Installation (Optional) (Gsb2/Mv Units Only) - FireplaceXtrordinair ProBuilder 54 Installation Manual

Table of Contents

Advertisement

68

Wall Mount Remote Thermostat installation (optional) (GSB2/MV Units ONLY)

Packing List
GS Wall Remote
Receiver Assembly
Switch Blank
Installation
If Using the Optional Blower, Install it First
The optional blower should be installed before installing the remote.
1
Remove the lower front access panel from the fireplace by reaching in behind it and loosening the two wing
nuts and (1) ¼" screw on each side of the panel that hold it in place (see "Removing the Front Panel" pg. 24
for details.) Lift up and then out on the panel to remove. Lay the panel face down in front of the fireplace.
2
Remove the 4 screws that secure the dashboard to the fireplace and gently lower it to gain access to the back
side.
NOTE
There should be enough slack in the attached wires to lower the dashboard to the floor. Make sure not
to damage any off the attached wires.
3
Remove the two wires from the back of the on/off switch.
© Travis Industries
Installation
(for qualified installers only)
(4) AA Batteries
(3) AAA Batteries
4/19/23 - 1453
PB 42 & 54 MV/GSB2/GSR2 Install

Advertisement

Table of Contents
loading

This manual is also suitable for:

Probuilder 42

Table of Contents