Wall Mount Remote Thermostat Installation (Optional For Gsb2 And Mv Only); Packing List; Installation - FireplaceXtrordinair ProBuilder 72 MV Installation Manual

Linear
Table of Contents

Advertisement

Wall Mount Remote Thermostat installation (optional for GSB2 and MV only)

Packing List

GS Wall Remote
Receiver Assembly
Switch Blank

Installation

If Using the Optional Blower, Install it First
The optional blower should be installed before installing the remote.
1
Remove the lower front access panel from the fireplace by reaching in behind it and loosening the two wing
nuts and (1) ¼" screw on each side of the panel that hold it in place (see fireplace manual for details.) Lift up
and then out on the panel to remove. Lay the panel face down in front of the fireplace.
2
Remove the 4 screws that secure the dashboard to the fireplace and gently lower it to gain access to the back
side.
NOTE
There should be enough slack in the attached wires to lower the dashboard to the floor. Make sure not
to damage any off the attached wires.
3
Remove the two wires from the back of the on/off switch.
© Travis Industries
Installation
(for qualified installers only)
(4) AA Batteries
(3) AAA Batteries
4/22/21 - 1458
PB 72 MV/GSB2/GSR2 Install
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Probuilder 72 gsb2Probuilder 72 gsr2

Table of Contents