Possible restrictions
Personnel requirements
• Protection of Electronic Computer/Data Processing
Equipment NFPA 75
• Any other applicable codes or regulations
The information in this document does not replace any applicable
local building codes or other applicable regulations.
Construction work or site modifications must be performed by
qualified electrical, mechanical, and structural contractors. All
work should be in accordance with the recommendations
provided in this document and any applicable codes.
Be sure to take into account possible design restrictions, such as:
• Building management policies concerning construction
• Other construction plans and maintenance work
• Budget constraints
HNS recommends a team of two qualified installers perform
antenna installation tasks. Installers must understand:
• Electronics fundamentals
• Cabling and connection practices
• Electrical circuits and grounding practices
• The importance of safety precautions
Installers must also be familiar with:
• Satellite communication fundamentals
• Applicable electrical, building, fire, and
safety codes and regulations
Chapter 2 • General requirements
1035678-0001 DRAFT Revision 1.04
9