Poe Scheduling - TRENDnet TPE-3012LS User Manual

12-port gigabit poe+ smart surveillance switch, 18-port gigabit poe+ smart surveillance switch
Table of Contents

Advertisement

TRENDnet User's Guide
4. Click Apply.
5. In the top right, click Save to save the configuration settings to NV-RAM/startup
configuration.
6. Click OK.

PoE Scheduling

PoE > PoE Scheduling
This section allows you to set a schedule for each PoE port when PoE should be enabled.
Note: Please make sure to set your time and date settings accordingly under Network >
System Time before using this feature.
1. Log into your switch management page (see
on page 11).
2. Click on Management and click on Time Range and click Add to add a new schedule.
3. Review the settings below.
Range Name - Enter a name or description to easily identify the schedule
(optional)
© Copyright 2020 TRENDnet. All Rights Reserved.
"Access your switch management
page"
Date – Select the days that PoE should be enabled and enter the time range
From and To (24-hour format). Click Apply to save the schedule configuration
and the schedule entry will appear in the list.
3. Click on PoE and click on PoE Scheduling. Check the first entry in the list and click Edit.
TPE-3012LS / TPE-3018LS
60

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpe-3d18ls

Table of Contents