Polycom ATX Integrator's Guide

Integrator's Toolkit

Integration Sequence

1–2
You should have the following items available before you begin the
integration:
Calculator
Display cleaner (non-ammonia or non-alcohol-based)
Gray card, Lastolite
Laptop
Laser level, Stanley or equivalent
Latex gloves for handling displays and cameras
Level, 2-foot
Light meter, Minolta or equivalent
Marker, black permanent
Microfiber cloth
Tape, low tack
Tape measure
Wire cutters and strippers
Wire ties
When installing a Polycom ATX SDK or ATX 300 system, you usually install it
in the order listed below. Note, however, that the integration sequence may
vary due to factors such as room configuration, limited space to store the
equipment, number of installers, and so on.
Hardware:
Select the room
1
Select the displays and table
2
Determine the placement of the displays and tables
3
Install the displays and table
4
Install the cameras
5
Create the camera alignment marks
6
Place the chairs
7