Cisco 12416 Installation And Configuration Manual page 357

Cisco systems bridge/router installation and configuration guide
Hide thumbs Also See for Cisco 12416:
Table of Contents

Advertisement

Chapter 7
Maintaining the Router
Figure 7-39 Installing a DC PEM
Power on the DC circuit breaker assigned to that PEM.
Step 6
Power on the PEM by switching on its circuit breaker.
Step 7
After the power-on sequence completes, the (green) PWR OK indicator on the
front of the PEM should light. If the indicator does not light, see the
"Troubleshooting the DC PEM Installation" section on page
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
OL-11495-01
a
Loosen captive
screw and pivot
ejector lever
b
Slide power module
into power shelf bay
PWR OK
FAULT
TEMP
Removing and Replacing a DC PEM
PWR OK
PWR OK
FAULT
FAULT
TEMP
TEMP
PWR OK
FAULT
TEMP
c
Close ejector
lever to seat
power module
d
Tighten
captive screw
7-66.
7-65

Advertisement

Table of Contents
loading

This manual is also suitable for:

1281612016

Table of Contents

Save Article as PDF