Removing and Replacing AC and DC Power Subsystem Components
Installing Upgrade Kits
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
7-32
When installing a power system upgrade kit, you replace the following
components:
AC power upgrades (12000/16-AC-UP=, 12000/16-AC4-UP=):
•
–
Power supplies
page
7-33).
Standard power shelf
–
Power Shelf, page
Replacing the Optional 2-Level AC-Input Power Shelf, page
DC power upgrade (12000/10-DC-UP=):
•
Power supplies
–
Power shelf
(Removing and Replacing the DC-Input Power Shelf,
–
page
7-68)
A blower upgrade (not included in the power upgrade kit) is also required
Note
to meet NEBS extended temperature range requirements. To order the
blower upgrade (12000/10/16-BLWER=), contact your Cisco
representative.
(Removing and Replacing an AC Power Supply,
(Removing and Replacing the Standard AC-Input
7-44) or optional power shelf
(Removing and Replacing a DC PEM, page
Chapter 7
Maintaining the Router
(Removing and
7-51)
7-60)
OL-11495-01