Cisco 12416 Installation And Configuration Manual page 141

Cisco systems bridge/router installation and configuration guide
Hide thumbs Also See for Cisco 12416:
Table of Contents

Advertisement

Chapter 3
Installing the Router
Step 2
Figure 3-13 Router Front Bonding and Grounding Receptacles
Air filter door
Step 3
OL-11495-01
Attach the grounding cable to the chassis
Insert two M6 bolts through the grounding holes in the chassis.
a.
Place the cable lug over the bolts and secure with the locking washers and
b.
nuts.
Prepare the other end of the grounding wire and connect it to the appropriate
grounding point at your site to ensure an adequate earth ground.
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
Supplemental Bonding and Grounding Connections
(Figure
3-13):
NEBS
supplemental
earth ground
receptacle
3-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

1281612016

Table of Contents

Save Article as PDF