Cisco 12416 Installation And Configuration Manual page 241

Cisco systems bridge/router installation and configuration guide
Hide thumbs Also See for Cisco 12416:
Table of Contents

Advertisement

Chapter 5
Troubleshooting the Installation
Figure 5-2
1 Ejector handle
Use the following procedure to troubleshoot the AC power supply if it is not
operating properly after installation.
Make sure the power supply is seated properly:
Step 1
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
OL-11495-01
2500 W AC Power Supply Components
1
2
Pw r Ok
Fault
Pwr Ok
Eject and reseat the PEM. Check that:
The ejector lever is locked into place by its spring clip (2000 W PEM),
or the captive screw on the ejector lever is tightened securely (2500 W
PEM).
Fa ult
Te mp
OC
Temp
2
Captive screw
Troubleshooting the Power Subsystem
OC
5-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

1281612016

Table of Contents

Save Article as PDF