Chapter 3
Installing the Router
Attaching the Vertical Cable-Management Trough
Step 1
Step 2
Step 3
Step 4
Step 5
OL-11495-01
Refer to
Figure 3-15
and use the following procedure to attach the vertical
cable-management trough.
Position the trough so that the access gate opens toward the front of the chassis.
Align the top screw holes on the inside panel of the trough with the chassis
standoffs.
Hand tighten two screws into the holes to hold the trough in place.
Repeat
Step 2
and
Step 3
standoffs.
Tighten all six screws with a Phillips screwdriver to secure the trough to the
chassis.
Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and Configuration Guide
Attaching the Vertical Cable-Management Trough
for the middle two standoffs and the bottom two
3-25