Quick Commissioning With The Iop-2 - Siemens SINAMICS G120D Operating Instructions Manual

Distributed inverter cu240d-2 control unit with encoder evaluation
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Commissioning

5.4 Quick commissioning with the IOP-2

5.4
Quick commissioning with the IOP-2
Commissioning a 1FK7 encoderless synchronous motor
If you want to operate the converter using a 1FK7 encoderless synchronous motor, we
recommend using the PC tools Startdrive or STARTER for commissioning.
Condition
The IOP-2 handheld is connected to the converter.
Description
Note
Screens and sequence may vary
The sequence of the commissioning process and the actual screens may vary according to the
following influences:
• The firmware version of the Intelligent Operator Panel 2 (IOP-2)
• The firmware version of the converter being commissioned
• The specific type of converter being commissioned.
In all the scenarios, the IOP-2 will always display the appropriate commissioning screens and
sequence for the converter to which it is connected.
Select Wizards
82
Commissioning tools (Page 76)
Select Basic Commissioning
wizard
Operating Instructions, 10/2020, FW V4.7 SP13, A5E34262100B AH
Select Factory Reset (yes or
no)
Converter with the control units CU240D-2

Advertisement

Table of Contents
loading

Table of Contents