Electrical Installation; Overview Of The Interfaces - Siemens SINAMICS G120D Operating Instructions Manual

Distributed inverter cu240d-2 control unit with encoder evaluation
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Installation

4.2 Electrical Installation

4.2
Electrical Installation
4.2.1

Overview of the interfaces

Intefaces of the converter
32
Digital inputs 0 ... 5 with status LED
Fieldbus IN and OUT (PROFINET or PROFIBUS)
24 V DC supply IN and OUT
Optical interface for operator panel IOP hand‐
held
Converter status LED
USB PC connection, address and bus termina‐
tion switch for PROFIBUS
Digital outputs 0 and 1 with status LED
HTL Encoder connection
Analog inputs 0 and 1
Slot for a memory card at rear of the Control
Unit
PROFINET status LED
PE grounding terminal
Mains supply connection
Motor, brake and temperature sensor connec‐
tions
Converter with the control units CU240D-2
Operating Instructions, 10/2020, FW V4.7 SP13, A5E34262100B AH

Advertisement

Table of Contents
loading

Table of Contents