Advanced commissioning
8.8 Switching over the drive control (command data set)
Example
As in the example above, you obtain the interconnection if you configured the interfaces of the
converter with p0015 = 7 in the basic commissioning.
An overview of all the parameters that belong to the command data sets is provided in the List
Manual.
Note
The converter requires approx. 4 ms to switch over the command data set.
Parameter
Parameter
p0010
r0050
p0170
r0722
p0809[0 ... 2]
p0810
p0811
p0840[C]
164
Connections and cables (Page 46)
Description
Drive commissioning parameter filter
CO/BO: Command data set CDS effective
Number of command data sets (CDS)
CO/BO: CU digital inputs, status
Copy command data set CDS
BI: Command data set selection CDS bit 0
BI: Command data set selection CDS bit 1
BI: ON/OFF (OFF1)
Converter with the control units CU240D-2
Operating Instructions, 10/2020, FW V4.7 SP13, A5E34262100B AH
Factory settings
1
-
2
-
0
0
0
Dependent on the